Existing conditions come first
We field-verify before pricing: structure, above-ceiling conditions, electrical capacity, HVAC condition and zoning, ADA and life-safety compliance triggers, and hazardous-material considerations in older buildings. Unknowns get carried as documented allowances rather than hidden in a lump sum.


