Preconstruction and Planning

Most commercial projects are won or lost before the first trade mobilizes. Preconstruction is where scope, budget and schedule are set honestly, or where optimistic assumptions get baked in and surface later as change orders.

  • What this covers
  • Feasibility
  • Early budgeting
  • Constructability and value engineering
  • Scheduling and long-lead materials
  • Risk identification, logistics and phasing

Bauer-Build's preconstruction work is designed to give you decision-grade information early, while changes still cost drawing time instead of demolition.

01

Feasibility

Before design fees are committed, we test whether the project works: site or building suitability, zoning and code implications, utility capacity, parking and access, and whether the program fits the space you are considering.

02

Early budgeting

We produce order-of-magnitude budgets from concept information and tighten them as design develops. Every budget is delivered with the assumptions and exclusions written down so you know what is and is not carried.

03

Constructability and value engineering

We review documents for conflicts, means-and-methods problems and details that will be expensive to build, then propose alternates that hold the design intent at a lower installed cost.

  • System-level alternates (structure, envelope, MEP)
  • Material substitutions with availability and lead-time impact
  • Phasing options that reduce premium-time work
  • Scope alternates priced separately so you can decide, not guess
04

Scheduling and long-lead materials

Switchgear, rooftop units, generators, custom glazing and specialty equipment routinely drive commercial schedules. We identify long-lead items during preconstruction and build procurement dates into the schedule instead of reacting to them.

05

Risk identification, logistics and phasing

We document the real risks, such as existing conditions, permit timelines, utility coordination and tenant or landlord approvals, and plan site logistics and phasing around how your business needs to keep operating.

How this service runs

  1. 01

    Discover

    Understand the business behind the building.

  2. 02

    Define

    Turn goals into a defined scope and an early budget range.

  3. 03

    Plan

    Preconstruction, pricing, permits and procurement.

  4. 04

    Build

    Supervised, sequenced, reported construction.

  5. 05

    Deliver

    Punch, inspections, closeout and turnover.

  6. 06

    Support

    Warranty and follow-through after opening.

See the full process

Preconstruction and Planning FAQs

Can you help before we have drawings?
Yes. Concept-stage engagement is where preconstruction adds the most value. A sketch, a lease exhibit or a program list is enough to start.
How accurate is an early budget?
Early budgets are ranges, not bids. Accuracy tightens as design and existing-conditions information develop; we state the confidence level with every number.